Aggregate Matters: Performance of Newly Placed VS 40 Year Old Concrete Stakeholders were concerned about cracks and patches of surface delamination on a concrete slab shortly after concrete placement and contracted C3S to evaluate and advise. Date: May 2020 Project...
Highway Soft Surface Probable Cause Determination of probable causes of soft surfaces on highway pavement, Interstate-45 around Conroe. Date: 06/22/2011 Project Type: Construction Phases Highway Soft Surface Probable Cause Determination About this Project An...
Aggregate Testing LNG plant in Angola Project Evaluation of local sources of aggregate through aggregate testing. Identified several good sources and eliminated potentially damage-prone sources. Date: 2005 to 2010 Project Type: Project Planning & Construction...
Asbestos-Cement Pipe Failure Analysis Three pieces of a section of an asbestos-cement pipe were presented for evaluation to determine the pipeโs condition. Date: 05/12/2017 Project Type: Maintenance Phase Asbestos-Cement Pipe Failure Analysis About this Project...
Structural Integrity Evaluation of Buried Concrete Water Reservoir Structural integrity evaluation of a 15 million gallon concrete water reservoir buried underground at Memorial & Sabine, built in 1926,ย in a negotiation to turn over the facility to a management...