Asbestos-Cement Pipe Failure Analysis

Asbestos-Cement Pipe Failure Analysis

Asbestos-Cement Pipe Failure Analysis Three pieces of a section of an asbestos-cement pipe were presented for evaluation to determine the pipe’s condition. Date: 05/12/2017 Project Type: Maintenance Phase Asbestos-Cement Pipe Failure Analysis About this Project...
Concrete Evaluation in a Navigational Lock

Concrete Evaluation in a Navigational Lock

Concrete Evaluation in a Navigational Lock A 40-year old Navigational Lock on the Kissimmee River showed several defects on the concrete walls including removal of patches of cement paste which has exposed several aggregates. Stakeholders needed a concrete evaluation...